| Mechanical Drawing Description | Preview | Download     .dwg |
| M-001_Rectangular Duct Angular Tap With Volume Damper.dwg | M-001 |  |
| M-002_Duct Support from Ceiling.dwg | M-002 |  |
| M-003_Sleeve Detail for Penetration of Fire.dwg | M-003 |  |
| M-004_Sidewall Register with Fire Damper( Wide).dwg | M-004 |  |
| M-005_Sidewall Register with Fire Damper (Narrow).dwg | M-005 |  |
| M-006_Combination Fire and Smoke Damper( with Fusible Link).dwg | M-006 |  |
| M-007_Piping Through Roof.dwg | M-007 |  |
| M-008_Duct Support- Upper Attachments.dwg | M-008 |  |
| M-009_Trapeze Pipe Support Detail.dwg | M-009 |  |
| M-010_Typical Diffuser Connection.dwg | M-010 |  |
| M-011_Supply Air Duct Neck Connections (with Volume Damper).dwg | M-011 |  |
| M-012_Rectangular Supply Air Duct Tap (With Volume Dampers).dwg | M-012 |  |
| M-013_balancing damper.dwg | M-013 |  |
| M-014_Low Pressure Balancing Damper.dwg | M-014 |  |
| M-015_Single Thickness Turning Vanes.dwg | M-015 |  |
| M-016_Typical Pipe Hanging Detail.dwg | M-016 |  |
| M-017_Typical Supplemental AC Unit Piping Detail.dwg | M-017 |  |
| M-018_Condenser Water Wet Tap.dwg | M-018 |  |
| M-019_Typical Condenser Water Riser Tie-In and Pump Connection.dwg | M-019 |  |
| M-020_Pipe Hangers.dwg | M-020 |  |
| M-021_Pitch Pocket Detail.dwg | M-021 |  |
| M-022_Detail at Piping Supports.dwg | M-022 |  |
| M-023_Typical Makeup Air Unit.dwg | M-023 |  |
| M-024_Typical Air Separator and Expansion Tank Detail.dwg | M-024 |  |
| M-025_Typical Pipe Support Detail At Roof.dwg | M-025 |  |
| M-026_Typical Water Source Heat Pump Piping.dwg | M-026 |  |
| M-027_Typical End Suction Pump Detail.dwg | M-027 |  |
| M-028_Typical Liebert Drycooler Piping Detail.dwg | M-028 |  |
| M-029_Typical Liebert AC Unit Piping Detail.dwg | M-029 |  |
| M-030_Typical Condensate Drain Piping Detail.dwg | M-030 |  |
| M-031_Typical Insulated Pipe Detail.dwg | M-031 |  |
| M-032_Heat Pump Sequence of Operation.dwg | M-032 |  |
| M-033_Makeup Air Control Sequence.dwg | M-033 |  |
| M-034_Computer Rom AC Unit Sequences.dwg | M-034 |  |
| M-035_Glycol Pumps and Dry Cooler Sequences.dwg | M-035 |  |
| M-036_Condensate Control Pump Sequence.dwg | M-036 |  |
| M-037_Exhaust Fan Sequence Operation.dwg | M-037 |  |
| M-038_Generator Exhaust Detail.dwg | M-038 |  |
| M-039_Generator Exhaust Detail.dwg | M-039 |  |
| M-040_Steam Heating Coil Piping Detail.dwg | M-040 |  |
| M-041_Steam Trap Rig Detail.dwg | M-041 |  |
| M-042_Steam Preheat Coil Piping Detail.dwg | M-042 |  |
| M-043_Steam Cabinet Heater Piping Detail.dwg | M-043 |  |
| M-044_Steam Unit Heater Piping Detail.dwg | M-044 |  |
| M-045_Steam Grid Humidifier Piping Detail (Single Manifold).dwg | M-045 |  |
| M-046_Steam Grid Humidifier Piping Detail (Multiple Manifolds).dwg | M-046 |  |
| M-047_Steam to Water Converter Detail( No Standby).dwg | M-047 |  |
| M-048_Steam Trap Rig Detail (Above 15 PSIG).dwg | M-048 |  |
| M-049_Flash Tank Detail.dwg | M-049 |  |
| M-050_Dual 2- Stage PRV Station.dwg | M-050 |  |
| M-051_Single 2- Stage PRV Station Detail.dwg | M-051 |  |
| M-052_Steam PRV Station Dual Single Stage.dwg | M-052 |  |
| M-053_Hot Water FIN TUBE Radiation Fed from Above Detail.dwg | M-053 |  |
| M-054_Hot Water FIN TUBE Radiation Fed fron Below Detail.dwg | M-054 |  |
| M-055_Hot Water FIN TUBE Radiation Fed from Riser Diagram.dwg | M-055 |  |
| M-056_Hot Water Cabinet Heater Piping Detail.dwg | M-056 |  |
| M-057_Hot Water Unit Heater Piping Detail.dwg | M-057 |  |
| M-058_Hot Water Heating Coil Piping Detail.dwg | M-058 |  |
| M-059_Hot Water Preheat Coil Detail.dwg | M-059 |  |
| M-060_Chilled Water Coil Piping Detail (2 Way Valve).dwg | M-060 |  |
| M-061_Coupon Rack.dwg | M-061 |  |
| M-062_Diaphram Expansion Tank Detail.dwg | M-062 |  |
| M-063_Open Expansion Piping Detail.dwg | M-063 |  |
| M-064_Ceiling Mounted AC Unit Piping Details.dwg | M-064 |  |
| M-065_Bypass Air Separator Detail.dwg | M-065 |  |
| M-066_Pipe Riser Base Elbow Support Detail.dwg | M-066 |  |
| M-067_Fan Coil Unit Piping Detail (Horizontal – 2- Pipe).dwg | M-067 |  |
| M-068_Detail of Piping Piercing Fire Rated Partitions.dwg | M-068 |  |
| M-069_Pipe Piercing Roof Detail.dwg | M-069 |  |
| M-070_Gas Train Piping Detail.dwg | M-070 |  |
| M-071_Duct Hanging Details in Metal Deck Slab.dwg | M-071 |  |
| M-072_Duct Hanging Detail with concrete inserts.dwg | M-072 |  |
| M-073_Roof Air Handler Ductwork Support Detail.dwg | M-073 |  |
| M-074_Fan Inertia Pad Mounting Detail.dwg | M-074 |  |
| M-075_Equipment Suspended from Concrete Slab.dwg | M-075 |  |
| M-076_Equipment Suspended from Structural Steel.dwg | M-076 |  |
| M-077_Louvered Pethouse.dwg | M-077 |  |
| M-078_Fan Powered Terminal.dwg | M-078 |  |
| M-079_Fan Powered Terminal.dwg | M-079 |  |
| M-080_Pinch Down Vav Terminal.dwg | M-080 |  |
| M-081_Horizontal Split CAse Pump.dwg | M-081 |  |
| M-082_Verticall Mounted Pump.dwg | M-082 |  |
| M-083_End Suction Pump.dwg | M-083 |  |
| M-084_Inline Pump.dwg | M-084 |  |
| M-085_Steam Condensate Pump.dwg | M-085 |  |
| M-086_Transfer Fan.dwg | M-086 |  |
| M-087_Roof Exhuast Fan.dwg | M-087 |  |
| M-088_Roof Exhaust Fan (Upblast.dwg | M-088 |  |
| M-089_Low Pressure Supply Riser Duct Connection (Ducted Return Similar.dwg | M-089 |  |
| M-090_High Pressure Supply Riser Duct Connection.dwg | M-090 |  |
| M-091_Circular Duct Connections.dwg | M-091 |  |
| M-092_Low Pressure Branch Duct Connections.dwg | M-092 |  |
| M-093_Transfer Air Duct (Within Hung Ceiling).dwg | M-093 |  |
| M-094_Existing Duct Cap.dwg | M-094 |  |
| M-095_Internal Boot.dwg | M-095 |  |
| M-096_Non-Ducted Return Air Shaft Connection.dwg | M-096 |  |
| M-097_High Pressure Branch Duct Connections (up to 6in SP).dwg | M-097 |  |
| M-098_Transfer Air Duct Assembly (Ceiling to Ceiling).dwg | M-098 |  |
| M-099._Streamline Sleeve.dwg | M-099 |  |
| M-100_Square Duct Elbow.dwg | M-100 |  |
| M-101_Shutter Type Fire Damper-3 Hour Rating High Pressur Systems.dwg | M-101 |  |
| M-102_Duct At Angle Thru Rated Wall.dwg | M-102 |  |
| M-103_Linear Air Outlets.dwg | M-103 |  |
| M-104_Duct Piercing Non=Rated Walls.dwg | M-104 |  |
| M-105_Prefabricated Boiler Stack Base and Riser.dwg | M-105 |  |
| M-106_Boiler Stack Thru Roof.dwg | M-106 |  |
| M-107_Boiler Breeching Expansion Joint.dwg | M-107 |  |
| M-108_Exhaust Stack Expansion Joint.dwg | M-108 |  |
| M-109_Shutter Type Fire Damper 1 half Hour Rating Low Pressure Systems.dwg | M-109 |  |
| M-110.dwg_Shutter Type Fire Damper (1 half Hour Rating) High Pressure Systems.dwg | M-110 |  |
| M-111_Shutter Type Fire Damper 3 Hour Rating Low Pressure Systems.dwg | M-111 |  |
| M-112_Roof Curb Detail.dwg | M-112 |  |
| M-113_Computer RM AC Unit Pipping Connections.dwg | M-113 |  |
| M-114_Computer Room AC Unit Piping Connection (Pipe Run Below Raised Floor).dwg | M-114 |  |
| M-115_Pitch Pocket For Roof Support.dwg | M-115 |  |
| M-116_AC Unit Piping Connection.dwg | M-116 |  |
| M-117_Cooling Tower Piping Detail.dwg | M-117 |  |
| M-118_Water Treatment Complete Piping System Detail.dwg | M-118 |  |
| M-119_Refrigeration Machine Piping Detail.dwg | M-119 |  |
| M-120_Pipe Riser Base Elbow Support.dwg | M-120 |  |
| M-121_Plate and Frame Heat Exchange Piping.dwg | M-121 |  |
| M-122_Duplex Fuel Oil Pump Set Schematic.dwg | M-122 |  |
| M-123_Equipment Raised From Concrete Slab.dwg | M-123 |  |